bitcoin
Bitcoin (BTC) $ 95,242.52
ethereum
Ethereum (ETH) $ 3,267.26
tether
Tether (USDT) $ 0.999329
bnb
BNB (BNB) $ 649.07
xrp
XRP (XRP) $ 2.21
cardano
Cardano (ADA) $ 0.88156
usd-coin
USDC (USDC) $ 0.999011
matic-network
Polygon (MATIC) $ 0.472496
binance-usd
BUSD (BUSD) $ 0.996452
dogecoin
Dogecoin (DOGE) $ 0.312415
okb
OKB (OKB) $ 45.08
polkadot
Polkadot (DOT) $ 6.83
shiba-inu
Shiba Inu (SHIB) $ 0.000021
tron
TRON (TRX) $ 0.244702
uniswap
Uniswap (UNI) $ 13.75
wrapped-bitcoin
Wrapped Bitcoin (WBTC) $ 95,178.50
dai
Dai (DAI) $ 0.999435
litecoin
Litecoin (LTC) $ 99.35
staked-ether
Lido Staked Ether (STETH) $ 3,265.45
solana
Solana (SOL) $ 178.64
avalanche-2
Avalanche (AVAX) $ 36.42
chainlink
Chainlink (LINK) $ 21.83
cosmos
Cosmos Hub (ATOM) $ 6.38
the-open-network
Toncoin (TON) $ 5.34
ethereum-classic
Ethereum Classic (ETC) $ 25.72
leo-token
LEO Token (LEO) $ 9.32
filecoin
Filecoin (FIL) $ 4.80
bitcoin-cash
Bitcoin Cash (BCH) $ 445.28
monero
Monero (XMR) $ 188.79
Sunday, December 22, 2024
spot_img
bitcoin
Bitcoin (BTC) $ 95,242.52
ethereum
Ethereum (ETH) $ 3,267.26
tether
Tether (USDT) $ 0.999329
bnb
BNB (BNB) $ 649.07
usd-coin
USDC (USDC) $ 0.999011
xrp
XRP (XRP) $ 2.21
binance-usd
BUSD (BUSD) $ 0.996452
dogecoin
Dogecoin (DOGE) $ 0.312415
cardano
Cardano (ADA) $ 0.88156
solana
Solana (SOL) $ 178.64
matic-network
Polygon (MATIC) $ 0.472496
polkadot
Polkadot (DOT) $ 6.83
tron
TRON (TRX) $ 0.244702
HomeNewsMarketBitcoin miner CleanSpark expands with first web site acquisition in Wyoming

Bitcoin miner CleanSpark expands with first web site acquisition in Wyoming


  • CleanSpark mentioned in a press launch on Thursday that it has acquired its first Bitcoin mining web site in Wyoming.
  • The corporate executed 75 megawatts of energy contracts, with 30 MW for the primary web site anticipated on-line by finish of 2024. 
  • A second web site will deliver the following 45 MW to CleanSpark’s Wyoming hashrate.

CleanSpark has introduced that it executed 75 megawatts of energy contracts and added to its rising capability with the acquisition of a brand new 30 megawatts Bitcoin mining web site in Cheyenne, Wyoming.

That is the corporate’s first web site within the location. When it turns into operational, it is going to add greater than 2 exahashes per second to the Nasdaq-listed BTC miner’s hashrate, CleanSpark mentioned in a press launch.

In the meantime, the corporate additionally eyes a second web site within the space, with closing of a deal for the actual property set to see the rollout of a further 45 MW to the Wyoming operations. This second web site coming on-line will add 3 EH/s to CleanSpark’s hashrate.

Operations at first web site anticipated earlier than 12 months finish

Based on CleanSpark, the Cheyenne-based facility is a completely immersion-cooled web site – the second such facility within the firm’s rising portfolio. The miner expects operations to go reside earlier than the top of the 12 months.

“On the heels of the College of Wyoming asserting the launch of its Bitcoin Analysis Institute and Senator Lummis introducing the Boosting Innovation, Expertise and Competitiveness via Optimized Funding Nationwide (BITCOIN) Act, we’re thrilled to broaden in a state so publicly supportive of our trade. Working along with native, state and nationwide leaders, CleanSpark plans to develop its footprint past Cheyenne, all through the gorgeous state of Wyoming,” Zach Bradford, CEO of CleanSpark, mentioned in a press release.

CleanSpark will deploy the brand new S21 immersion XPs on the new web site, tapping into the most recent Bitcoin mining machines. The XPs are at the moment probably the most highly effective and environment friendly of BTC mining machines.

CleanSpark recenty acquired GRIID Infrastructure

With the addition of Wyoming, CleanSpark now will increase its presence into three states. The miner’s portfolio contains information facilities in Georgia, Mississippi, and Wyoming, in addition to co-locations in Tennessee and New York.

The corporate additionally disclosed its acquisition of Tennessee-based miner GRIID Infrastructure.

As soon as the all-stock deal price $155 million on the time finalizes, CleanSpark will provides about 100 MW of energy in 2024. It targets reaching 200 MW by finish of subsequent 12 months and 400 MW by finish of 2026 for the Tennessee facility.

CleanSpark is without doubt one of the US-based Bitcoin mining firms that not too long ago met with former US president Donald Trump, a gathering that noticed the 2024 presidential candidate say America must be on the forefront of mining BTC.

Trump additionally spoke on the Bitcoin 2024 convention in Nashville, Tennessee in late July.

 

Bitcoin miner CleanSpark expands with first web site acquisition in Wyoming

RELATED ARTICLES

Most Popular